Towards the reactive building process management
BIM and AI techniques to improve time and cost optimisation in construction sites
tab edizioni
Digital tools and techniques, also because of the recent restrictions caused by the pandemic, have gained an almost necessary role in human activities. The construction sector, which is structurally slower in metabolising innovation, has a significant productivity gap when compared with manufacturing. This research therefore analyses the management methodologies used today for construction and proposes, through the principles of reactive programming and an integrated use of BIM and IT tools, a tested methodology capable of increasing the productivity and quality of the construction process on building site.
- ISBN: 978-88-9295-363-5
- Data di pubblicazione: feb 2022
- Formato digitale: PDF
- Lingua: inglese
- Prefazione di: Gabriele Novembri
- Serie: Bauhaus 101
Francesco Livio Rossini (1988) architect, PhD in engineering-based architecture, is a post-doc researcher and adjunct professor in Construction Site Organisation at Sapienza University of Rome. Visiting researcher at the University of Grenoble/Alpes, he takes part to research project granted by European Union (LIFE-Primed) and by the Italian Ministry of Culture (PRIN 2017) about the digitalisation of the building process. He also manages as project manager complex construction sites in the domain of cultural heritage, hospitality and worship buildings.